KELDRANE LTDPRECISION BUILDS
A crane lifting timber frame panels over houses under construction

Keldrane Ltd

Precision Builds

Timber frame homes, from the sole plate to handover.

Keldrane Limited is a carpentry contractor based in Dublin 15 and working nationwide. We erect timber frame houses, roof them, fit them out and install the kitchens and wardrobes, for developers and main contractors, from single homes to multi-unit schemes.

Nationwide

Crews for sites anywhere in Ireland

Fully insured

Certificates on request

Ticketed crews

Safe Pass, CSCS and more

RCT & VAT

Registered, Revenue compliant

What we do

One carpentry contractor for the whole house, stage by stage.

Take one stage or all four. Each crew works to your drawings and programme and hands each plot over clean, checked and ready for the next trade, so you deal with one team and one point of contact on site.

01 /04

House Erecting · Timber Frame

From the sole plate to a weathertight shell.

Our crews work storey by storey, from the first panel on the sole plate to roof trusses, membrane, battens and roof tiles, and hand the house over weathertight and ready for first fix. One team, one programme: so the frame goes up square, on time and the way it was designed.

  • Wall panels

    Open and closed panels set out on the sole plate, plumbed, lined up, fixed and braced to the drawings.

  • Floor cassettes and joists

    Cassettes or loose joists, hangers, blocking and floor decks, storey by storey.

  • Crane lifts

    We supply or coordinate the crane; our crew slings, signals and lands panels, cassettes and trusses.

  • Roof trusses and bracing

    Trusses set out on the wall plate, gable panels, binders and bracing to the engineer's layout.

  • Membrane, battens and roof tiling

    Sheathing, breather membrane, felt and battens, then tiles or slates, ridges and valleys.

  • Ready for first fix

    Each plot checked and handed over clean, square and ready for the following trades.

What we need from you

  • Construction and frame drawings
  • Build programme and delivery dates
  • Clear crane access and set-up area
  • Engineer's truss and bracing details
  • Scaffold erected to each lift
  • Level slabs or foundations, set out
Timber frame panels standing on the sole plate
The frame
Crane lifting panels over the site
Crane lifts
Roof trusses set out on the wall plate
The roof
Membrane and battens on a roof
Membrane & battens
Roof tiling in progress
Roof tiling
Membrane and battens ready for roof tiles
Membrane & battens · Ready for tiles

02 /04

First Fix Carpentry

From open frame to ready for plaster.

Everything is set out from the drawings, built plumb, level and square, with backing in the right place for kitchens, bathrooms, radiators and services, so the electrician, plumber and plasterer follow on without waiting or rework.

  • Stud partitions

    Internal walls set out from the drawings, built plumb and straight, with heads and trimmers over every opening.

  • Door openings and linings

    Openings framed to the door schedule, linings fitted square and plumb, ready for second fix.

  • Ceilings and service voids

    Battens and counter-battens to level ceilings, leaving a clear void for cables and pipes.

  • Stairwells and attic hatches

    Stairwell and landing framing, temporary guarding, trimmed openings and attic hatches.

  • Noggins and backing

    Solid backing for kitchen units, sanitary frames, radiators, handrails and TVs, placed to the layouts.

  • Ready for the next trades

    Each plot checked and handed over clean and square, ready for M&E first fix and plasterboard.

What we need from you

  • Floor plans and door schedule
  • M&E positions
  • Materials on site or ordered
  • Kitchen and bathroom layouts
  • Build programme
  • Frame complete and weathertight
Stud partitions set out from the drawings
Stud partitions
Stairwell framing with temporary guarding
Stairwells
Levelled ceilings with service voids
Ceilings & services

03 /04

Second Fix Carpentry

From plaster to handover.

Once the plaster is dry, our second fix crews finish the joinery: internal and fire doors, ironmongery, skirting and architrave, window boards, handrails and attic hatches. Every door hung to an even gap, every mitre closed, every handrail solid under the hand.

  • Doors and ironmongery

    Internal and fire doors trimmed and hung to even gaps, with hinges, locks, handles and closers to the schedule.

  • Skirting and architrave

    Cut, mitred and fixed tight to walls and floors, ready for the painter.

  • Window boards

    Cut to the reveals, notched round the returns, level and fixed solid.

  • Handrails and balustrades

    Newel posts, handrails, spindles and landing balustrades fitted rigid and plumb.

  • Attic hatches

    Hatch linings, trims and doors fitted neat to the ceiling, ready for paint.

  • Snagged and handed over

    Each plot snagged, cleaned and handed over ready for paint and the buyer.

What we need from you

  • Floor plans and door schedule
  • Stair and handrail details
  • Materials on site or ordered
  • Ironmongery schedule
  • Build programme
  • Plastering complete and dry
Handrail and balustrade fitted rigid and plumb
Handrails
Doors hung to even gaps with ironmongery fitted
Doors & ironmongery

04 /04

Furniture Fitting · Kitchens & Robes

Kitchens and wardrobes, fitted right.

Our fitting crews install kitchens and fitted wardrobes from single homes to apartment schemes. Every unit level, every door and drawer aligned, every panel scribed to the wall. On apartment schemes we fit them room after room, to the same finish.

  • Kitchen units

    Base, wall and tall units assembled, levelled and fixed to the layout, with doors and drawers aligned.

  • Worktops and panels

    Worktops, upstands, end panels, plinths and fillers cut and scribed to the walls.

  • Islands and tall units

    Islands set out and fixed square; tall units and appliance housings plumb and secure.

  • Fitted wardrobes

    Fixed level and scribed to walls and ceilings, doors aligned and handles fitted.

  • Wardrobe interiors

    Shelves, hanging rails, drawers and dividers fitted to the layout.

  • Snagged and handed over

    Each unit snagged, cleaned and handed over ready for the buyer.

What we need from you

  • Kitchen and wardrobe layouts
  • Delivery dates
  • Materials on site or ordered
  • Unit and appliance schedules
  • Build programme
  • Rooms plastered and dry
Kitchen island and tall units fitted square
Islands & tall units
Fitted wardrobes scribed to walls and ceilings
Fitted wardrobes
Roof tiling closing in a timber frame house
Roof tiling · Closed in, no extra trade

How we work

Five steps from your drawings to a plot ready for the next stage.

  1. 01

    Send us the drawings

    Plans and schedules for the stage you need, engineer's details where they apply, and your build programme.

  2. 02

    Price and method

    A clear quote per plot or per scheme, with crew size, time per unit and, for frames, the erection sequence and crane plan.

  3. 03

    Plan and check

    Deliveries, scaffold and crane booked around the schedule; materials checked against it before we start.

  4. 04

    Build and check

    Every stage checked against the drawings for plumb, level, gaps and finish before the next one begins.

  5. 05

    Hand over

    Each plot signed off clean, ready for the following trade or for the buyer.

Why Keldrane

Experienced carpenters, the right fixings and a tidy, safe site.

Training & tickets

  • Safe Pass
  • CSCS
  • Working at Heights
  • Abrasive Wheels
  • Black Hat
  • Slinger / Signaller
  • Telescopic Handler
  • First Aid
  • Nationwide

    Crews available for sites anywhere in Ireland.

  • Fully insured

    Certificates available on request.

  • Trained crews

    Fully ticketed operatives on every site.

  • Revenue compliant

    RCT and VAT registered, as subcontractor and principal contractor.

  • Crane lifts covered

    We supply or coordinate the crane.

  • Finish first time

    Tight joints, even gaps, fewer snags at handover.

  • One point of contact

    One team from the first panel to the last fitted unit.

  • Right first time

    Backing and openings to the layouts, no rework for other trades.

Recent work

Panels going in, plot after plot.

From single houses to long terraces and apartment blocks, panels are landed straight from the hook onto the sole plate, lined up, fixed and braced, and the floor deck follows behind. Scaffold, crane and crew work to one sequence.

A long terrace of timber frame houses under way
Terrace under way
Wall panels being landed on the sole plate
Panels going in
Scaffold around a timber frame house
A weathertight timber frame envelope
A fitted kitchen handed over snag-free

Track record

Schemes we have worked on in 2026.

34

Sites

12

Counties

4

Trades

  • Horgan's Quay Residential Quarter

    302 apartments

    Cork City · BAM Ireland

    Kitchens & wardrobes

  • Center Parcs Longford Forest

    83 new lodges

    Ballymahon, Co. Longford · John Sisk & Son

    Carpentry

  • Oscar Traynor Woods

    853 homes

    Coolock, Dublin 5 · Glenveagh for Dublin City Council

    Carpentry

  • The Foothills

    635 homes

    Killinarden, Tallaght, Dublin 24 · Arden Team (Sisk Living)

    Carpentry

  • An tSrúill, Cromcastle

    146 apartments

    Coolock, Dublin 5 · Land Development Agency

    Joinery

  • Balmoston

    1,200 homes

    Ballymastone, Donabate · Glenveagh

    Carpentry

  • Mooretown

    650 homes

    Swords, Co. Dublin · Glenveagh

    Carpentry & joinery

  • Folkstown Park

    Balbriggan, Co. Dublin · Glenveagh

    Carpentry

  • Regles

    Lusk, Co. Dublin · Dwyer Nolan Developments

    Carpentry

  • Bennetstown

    578 homes

    Dunboyne, Co. Meath · Glenveagh

    Carpentry & joinery

  • Riversend

    Effernock, Trim, Co. Meath · Glenveagh

    Carpentry

  • Sommerville

    223 homes

    Athlumney, Navan · Lagan Homes

    Carpentry

  • Fairywood

    74 homes

    Ratoath, Co. Meath · Lagan Homes

    Carpentry

  • Gort Mell

    237 homes

    Drogheda, Co. Louth · Lagan Homes

    Carpentry

  • Ard na Páirce Theas

    166 homes

    Kildare Town · Lagan Homes

    Carpentry

  • Sand Wood

    94 homes

    Portlaoise, Co. Laois · Woodfort Group

    Carpentry

  • Seaview Court

    130 homes

    Rocksborough, Wexford · Milltown Developments

    Carpentry

  • Slí na hAbhann

    156 homes

    Rahoon, Galway · Cairn Homes

    Carpentry, kitchens & wardrobes

  • Heather View

    87 homes

    Snugborough, Castlebar · Sayvale Homes

    Kitchens & wardrobes

Longford, Dublin, Meath, Louth, Kildare, Laois, Westmeath, Wexford, Galway, Mayo, Sligo and Cork. Unit numbers are for the whole scheme.

Request a quote

Send us your drawings for a price on your next scheme.

Email what you have and we will come back with a price per plot and a programme. Pick the stage to see what to include.

  1. 01Architect's and frame manufacturer's drawings
  2. 02Engineer's truss and bracing details
  3. 03Build programme and delivery dates
  4. 04Site access for the crane and scaffold plan
Email your drawings
Webwww.keldrane.com
Keldrane Limited
Unit 1A, B.A.S.E. Enterprise Centre
Damastown Industrial Park, Dublin 15, D15 YX6X